SAP ABAP Data Element SCMNG (Minimum Quantity for Splitting Quota)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
SRM-EBP (Application Component) Enterprise Buyer
⤷
BBP_APPLICATION (Package) Structure Package EBP
⤷
ME (Package) Application development R/3 Purchasing

⤷

⤷

⤷

Basic Data
Data Element | SCMNG |
Short Description | Minimum Quantity for Splitting Quota |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG15 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 15 | |
Decimal Places | 3 | |
Output Length | 19 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Min. Qty |
Medium | 15 | Minimum Qty |
Long | 30 | Min. Qty for Splitting Quota |
Heading | 19 | Min. Qty Splitting |
Documentation
Definition
Specifies for the splitting quota the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run.
If the lot is smaller than or equal to the minimum quantity, the system will proceed on the basis of the usual quota arrangement logic.
Dependencies
Allocation by quota using splitting quotas is only carried out via a requirement planning run, subject to the following preconditions:
- Through the appropriate entry in the field Quota arrangement usage (on the MRP data screen 2 or Purchasing screen) it must have been specified that a quota arrangement is to be applied in the planning run.
- The indicator for the splitting quota must be set for the the lot-sizing procedure used for materials planning purposes in Customizing.
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in |