SAP ABAP Data Element SCMA_NEXTRUN (Schedule Manager Runtime Analysis: Est. Runtime of Next Run)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-SCM (Application Component) Schedule Manager
     KPEP (Package) Schedule Manager
Basic Data
Data Element SCMA_NEXTRUN
Short Description Schedule Manager Runtime Analysis: Est. Runtime of Next Run  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR17    
Data Type CHAR   Character String 
Length 17    
Decimal Places 0    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Runtime 
Medium 15 Runtime 
Long 20 Runtime 
Heading 17 Runtime 
Documentation

Definition

The estimated runtime of the next start is determined as follows:

The system calculates the average difference from the difference between last two runs and the total average, and from the difference between the last two runs.

This is added to the current total average (including +/- sign).

Note that this runtime can only provide a rough mathematical estimation. The true runtime however, also contains factors such as workload, number of users and so on. These factors cannot be included in the calculation.

If you can provide a better estimation based on experience, enter this in the customer field for estimations.

History
Last changed by/on SAP  20000218 
SAP Release Created in 46C