SAP ABAP Data Element SCMA_DAYS_BEFORE_KEY_DATE (Days Before Key Date)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-SCM (Application Component) Schedule Manager
     KPEP (Package) Schedule Manager
Basic Data
Data Element SCMA_DAYS_BEFORE_KEY_DATE
Short Description Days Before Key Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC2    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Days 
Medium 15 Days 
Long 20 Days Before Key Date 
Heading  
Documentation

Definition

The key date is usually today's date. In this field, you need to enter the number of days before the key date (from which date) the Schedule Manager should import log information (such as, on jobs or transactions). In other words, the schedule manager imports log information on business transactions that have already taken place.

Select the smallest number of days possible in this field, as each extra day that needs processing slows down the system performance.

History
Last changed by/on SAP  20000128 
SAP Release Created in