Hierarchy
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | SA_POSTN |
Short Description | Post activities after last reporting point |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SA_CBOX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ops.aft.RP |
Medium | 20 | Ops. after last RP |
Long | 28 | Operations after last RP |
Heading | 7 | Ops.aRP |
Documentation
Definition
Instructs the system to post the activities for all operations in the routing that are situated after the last reporting point.
Use
You select this indicator if you want the system to post the goods receipt at the last reporting point backflush, but you have also defined operations after the last reporting point for which you want to post the activities.
Procedure
Dependencies
The system calaculates the production activities using the standard cost estimate for the material and posts them to the product cost collector. If you have created a preliminary cost estimate for the product cost collector, the system calculates the production activities using this cost estimate.
If you select this function, you cannot enter a reporting point. The system automatically selects all operations after the last reporting point.
History
Last changed by/on | SAP | 19990601 |
SAP Release Created in |