SAP ABAP Data Element SA_OFPMG (Planned quantity still open in the following period)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | SA_OFPMG |
Short Description | Planned quantity still open in the following period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Open qty |
Medium | 15 | Open quantity |
Long | 20 | OpenQty in foll.per. |
Heading | 10 | Open qty |
Documentation
Definition
Quantity of the following period that according to the master plan can be backflushed for the material. The quantity you actually backflush may be more or less than this quantity.
Use
Procedure
Examples
Dependencies
The quantity displayed here results from the reduction period defined in Customizing for repetitive manufacturing: The system adds all planned order quantities and run schedule quantities that lie before the date calculated by adding the backflush date to the reduction period. The quantities are reduced when executing the backflush.
History
Last changed by/on | SAP | 19940827 |
SAP Release Created in |