SAP ABAP Data Element SA_BCKFL (Backflush with cost estimate/standard cost est. for material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | SA_BCKFL |
Short Description | Backflush with cost estimate/standard cost est. for material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SA_BCKFL | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cost est. |
Medium | 15 | Costing |
Long | 20 | Costing |
Heading | 4 | CEst |
Documentation
Definition
Controls whether the system takes the following activities into account when backflushing:
- activities based on the preliminary costing (version-specific costing) for the product cost collector
- activities based on the standard cost estimate for the material.
Use
Depending on this indicator, you can either backflush the activities on the basis of the preliminary costing for the product cost collector or on the basis of the standard cost estimate for the material.
Procedure
Examples
Dependencies
If activities are to be backflushed according to the preliminary costing, the simultaneous costing in Cost Object Controlling is based on this data.
You can also valuate work in process and scrap on the basis of this preliminary costing. For this purpose, you must define the following valuation variants in Customizing for Product Cost by Period:
History
Last changed by/on | SAP | 19980423 |
SAP Release Created in |