SAP ABAP Data Element S2L_PELM_TYPE_ABBRV (Short Name of Planning Element)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-A-S2L (Application Component) Production Supply
⤷ DI_S2L (Package) Production Supply
⤷ IS-A-S2L (Application Component) Production Supply
⤷ DI_S2L (Package) Production Supply
Basic Data
Data Element | S2L_PELM_TYPE_ABBRV |
Short Description | Short Name of Planning Element |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | S2L_PELM_TYPE_ABBRV | |
Data Type | CHAR | Character String |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plng Elem. |
Medium | 15 | Planning Elem. |
Long | 20 | Planning Element |
Heading | 10 | Plng Elem. |
Documentation
Definition
Short name for a planning element in production supply.
A short text is displayed for every short name.
Use
The following planning elements exist:
- APOReq: dependent requirement from SAP APO
- APOUsg: dependent requirement from SAP APO. The order has already passed the component, but no subsequent reporting point has been entered yet.
- APORm: Dependent requirement from SAP APO. The order already passed through the reporting point subsequent to the assembly location. The goods issue has not yet been posted, however.
- RpRcrd: Reprocessing record. Stock has already been physically removed but for technical reasons (on the posting side) the stock could not yet be reduced.
- IM Stk: Storage location stock
- WM Stk: WM bin inventory. Each row is a quant in a fixed storage bin.
- SumJC: Summarized JIT call
- RpPrp: Replenishment proposal
- AR Res: Dependent reservation (created from production order) from the SAP R/3
- DepReq: Dependent requirement from the ERP system
- MR Res: Manual reservation from the ERP system
- TotReq: MRP Total Requirement from the ERP system
The row indicated with an arrow (----->) has a special role concerning issue stock: it does not correspond to a real planning element, but selects the point in the missing parts calculation run at which the issues and receipts have already been totalled and at which the shortage check is made against the minimum stock.
The stock available in the stock issue row should correspond to the physical stock on the production line. This only applies if you are working with requirements from SAP APO.
Dependencies
Example
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |