SAP ABAP Data Element S2L_PELM_EFF_TOTAL (Proportion of Requirement/Received Qty Relevant for Planning)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-A-S2L (Application Component) Production Supply
⤷
DI_S2L (Package) Production Supply

⤷

⤷

Basic Data
Data Element | S2L_PELM_EFF_TOTAL |
Short Description | Proportion of Requirement/Received Qty Relevant for Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | S2L_QUANTITY | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 15 | |
Decimal Places | 3 | |
Output Length | 20 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | EffTot.Qty |
Medium | 15 | Eff. Total Qty |
Long | 20 | Eff. Total Quantity |
Heading | 19 | Eff. Total Quantity |
Documentation
Definition
The effective proportion of a planning element's Total Quantity adjusted for the missing parts calculation. Partial confirmations are considered here but the splitting of a dependent requirement at the end of a Planning Horizon is not considered at this point.
The inbound quantity for the missing parts calculation is shown in the Planning Item Requirements-/Qty Received field, that you should therefore also use when displaying the planning elements.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |