SAP ABAP Data Element S2L_EDIT_QTY_MAN_CCY (Replen.Qty for Manual SumJC Control Cycles Ready for Input)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-A-S2L (Application Component) Production Supply
⤷
DI_S2L (Package) Production Supply

⤷

⤷

Basic Data
Data Element | S2L_EDIT_QTY_MAN_CCY |
Short Description | Replen.Qty for Manual SumJC Control Cycles Ready for Input |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Man. SumJC |
Medium | 20 | Man. SumJC ContCycle |
Long | 38 | Man.SumJC Control Cycles Ready f.Input |
Heading | 33 | Manual SumJC CCs Ready for Input |
Documentation
Definition
Defines whether you can also create replenishment proposals for supply segments that are based on manually created summarized JIT calls.
Use
If this indicator has not been set, you can select such a supply segment in the supply-to-production table and copy it to the change mode.
Dependencies
Note that these control cycles are not included in an automatic planning run.
Example
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |