SAP ABAP Data Element S2L_CUM_MISS_QTY_1_R (Cumul.Missing Qty w/o Temporary Shortages w.Replen.Proposals)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-A-S2L (Application Component) Production Supply
⤷
DI_S2L (Package) Production Supply

⤷

⤷

Basic Data
Data Element | S2L_CUM_MISS_QTY_1_R |
Short Description | Cumul.Missing Qty w/o Temporary Shortages w.Replen.Proposals |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | S2L_UQUANTITY | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 15 | |
Decimal Places | 3 | |
Output Length | 19 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cumul.MQ1 |
Medium | 15 | Cumul.MQ1 w. RP |
Long | 28 | Cumul.MissQty1 w. Repl.Prop. |
Heading | 46 | Cumulated Missing Qty 1 with Replen. Proposals |
Documentation
Definition
Shows the distribution of the missing quantity.
If material shortages exist, this corresponds to the quantity:
Total requirements + Minimum stock - Total receipt quantity
(Total requirements and total receipt quantity referring to the existing planning elements up to the current planning element)
Missing quantities that arise due to temporary shortages are reduced again due to subsequent receipt quantities.
(In this case, replenishment proposals are taken into account.)
Note
This quantity is calculated twice - once without considering the replenishment proposals and once taking the replenishment proposal into account.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |