Hierarchy
⤷
⤷
Basic Data
| Data Element | RMXTE_RESSOURCE |
| Short Description | Resource |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ARBPL | |
| Data Type | CHAR | Character String |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 8 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | AGR | |
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plng Res. |
| Medium | 15 | Plng Resource |
| Long | 20 | Planning Resource |
| Heading | 20 | Planning Resource |
Documentation
Supplementary Documentation - RMXTE_RESSOURCE0001
Procedure
Specify the resources for which PI sheets are to be selected.
The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on
- whether you maintain the field only in the left column or also in the right
- which selection option you choose for the value
Supplementary Documentation - RMXTE_RESSOURCE0002
Procedure
Specify the resources for which PI sheets are to be selected.
Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).
Supplementary Documentation - RMXTE_RESSOURCE1000
Definition
Use
Procedure
Enter the resources for which the system is to generate process instructions.
Examples
Dependencies
Supplementary Documentation - RMXTE_RESSOURCE_ZU_EQR0001
Procedure
Specify the resources for which PI sheets are to be selected.
The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on
- whether you maintain the field only in the left column or also in the right
- which selection option you choose for the value
Supplementary Documentation - RMXTE_RESSOURCE_ZU_EQR0002
Procedure
Specify the resources for which PI sheets are to be selected.
Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).
Supplementary Documentation - RMXTE_RESSOURCE_ZU_EQR1000
Definition
Use
Procedure
Enter the resources for which the system is to generate process instructions.
Examples
Dependencies
History
| Last changed by/on | SAP | 20031212 |
| SAP Release Created in | 471 |