SAP ABAP Data Element RMAN_PRSP_INSP_LOT_PAST_CR (Inspection Lot Creation Dates: Number of Days in Past)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
EP-PCT-MAN-PS (Application Component) BP for Production Supervisor
⤷
RMAN_PRSP (Package) Production Supervisor UI

⤷

⤷

Basic Data
Data Element | RMAN_PRSP_INSP_LOT_PAST_CR |
Short Description | Inspection Lot Creation Dates: Number of Days in Past |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC5 | |
Data Type | NUMC | Character string with only digits |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Days Past |
Medium | 15 | Days Past |
Long | 35 | Insp. Lot Creation: No. Days Past |
Heading | 42 | Inspection Lot Creation: No. Days in Past |
Documentation
Definition
Specifies when the evaluation period for the selection of inspection lots begins (days in the past). This information is specified in days.
The end of the evaluation period is today's date.
The system selects all inspections lots whose creation dates lie within this evaluation period.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20050705 |
SAP Release Created in | 600 |