SAP ABAP Data Element RLDAT (Compare value for reset)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷
PY-XX (Application Component) Payroll: General Parts
⤷
PCAL (Package) SAP HR Payroll Application Development
⤷
⤷
Basic Data
| Data Element | RLDAT |
| Short Description | Compare value for reset |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHDAT | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Compare |
| Medium | 15 | Compare value |
| Long | 20 | Compare value |
| Heading | 3 | Com |
Documentation
Definition
Indicator determining which date in a payroll period is to be used for comparison with the starting point.
There are three possibilities:
- The start date of the payroll period
- The end date of the payroll period
- The payment date of a payroll period.
Use
The date specified here is compared with the starting point. If it is earlier than or the same as the starting point, a new interval is started and the amount is reset according to a certain limit. The period of an interval is updated and a new cumulation begun.
History
| Last changed by/on | SAP | 19950401 |
| SAP Release Created in |