SAP ABAP Data Element RKE_TRPROP_MODUS (Type of proposal)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PA (Application Component) Profitability Analysis
     KE_DB (Package) Profitability Analysis, database interface
Basic Data
Data Element RKE_TRPROP_MODUS
Short Description Type of proposal  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Type 
Medium 15 Type 
Long 20 Type of proposal 
Heading 18 Type of proposal 
Documentation

Definition

The type of proposal influences the strategy by which summarization levels are proposed:.

Enhancement Proposal

Existing summarization levels are taken into account during optimization, and only additional summarization levels are proposed.

Use this type of proposal if new report requirements have been added, and these are not yet supported by summarization levels.

Replacement Proposal

With this type of proposal, all existing summarization levels are ignored. The proposed summarization levels replace the existing levels.

Use the replacement proposal if a large number of summarization levels have been created as a result of repeated use of the enhancement proposal, and the number summarization levels needs to be reduced.

Further notes

  • If you use the enhancement proposal repeatedly, more and more summarization levels will be proposed. The system will not propose deletion of summarization levels which are no longer required.
  • The replacement proposal does not delete any summarization levels either. It also creates new levels. So that the old summarization levels can remain as long as possible, first start a reset for the proposed summarization levels. Then delete the old summarization levels using the IMG activity Define summarization levels.

History
Last changed by/on SAP  20130529 
SAP Release Created in