SAP ABAP Data Element RESCCOSTSFORCONDITION (Costs After Considering Settlement Period and Calc. Rule)
Hierarchy
EA-FIN (Software Component) EA-FIN
   RE-FX-SC (Application Component) Service Charge Settlement
     RE_SC_AJ (Package) SCS: Adjustment
Basic Data
Data Element RESCCOSTSFORCONDITION
Short Description Costs After Considering Settlement Period and Calc. Rule  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RECACURR    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 SP Costs 
Medium 15 Costs by SP 
Long 20 Costs- SP + CalcRule 
Heading 10 SP Costs 
Documentation

Definition

Costs after taking the settlement period and the calculation rule into account.

Use

Dependencies

Example

For the rent adjustment, the condition has a settlement period of one month. The condition amount is an amount per square meter of residential space. The rental object has 80 square meters of residential space.

The electricity costs projected for the year amount to 480 EUR.

Taking the above settlement period into account, the costs are:

480 : 12 = 40

Applying the above reporting rule, the costs are:

40 : 80 = 0.50

History
Last changed by/on SAP  20040909 
SAP Release Created in 200