SAP ABAP Data Element RESCCOSTSFORCONDITION (Costs After Considering Settlement Period and Calc. Rule)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
RE-FX-SC (Application Component) Service Charge Settlement
⤷
RE_SC_AJ (Package) SCS: Adjustment
⤷
⤷
Basic Data
| Data Element | RESCCOSTSFORCONDITION |
| Short Description | Costs After Considering Settlement Period and Calc. Rule |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | RECACURR | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 15 | |
| Decimal Places | 2 | |
| Output Length | 21 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | SP Costs |
| Medium | 15 | Costs by SP |
| Long | 20 | Costs- SP + CalcRule |
| Heading | 10 | SP Costs |
Documentation
Definition
Costs after taking the settlement period and the calculation rule into account.
Use
Dependencies
Example
For the rent adjustment, the condition has a settlement period of one month. The condition amount is an amount per square meter of residential space. The rental object has 80 square meters of residential space.
The electricity costs projected for the year amount to 480 EUR.
Taking the above settlement period into account, the costs are:
480 : 12 = 40
Applying the above reporting rule, the costs are:
40 : 80 = 0.50
History
| Last changed by/on | SAP | 20040909 |
| SAP Release Created in | 200 |