SAP ABAP Data Element RECDCALCMETHPER (Calculation method for time-dependent periods)
Hierarchy
EA-FIN (Software Component) EA-FIN
   RE-FX-CN (Application Component) Real Estate Contract
     RE_CD_CD (Package) RE: Conditions
Basic Data
Data Element RECDCALCMETHPER
Short Description Calculation method for time-dependent periods  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RECDCALCMETHPER    
Data Type NUMC   Character string with only digits 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PRO_RATA_METHOD_CALCULATION   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Calc.meth. 
Medium 15 Calculat.Method 
Long 20 Calculation Method 
Heading CaMe 
Documentation

Definition

The calculation method specifies whether 30 days or the actual number of days in the month are used for making calculations proportional to the whole month.

Use

30 Days for Every Month:
Calculation base is always 30 days.

Exact Days:
Calculation base is always the number of days in the respective month.

Period-Specific, By Year:
See Fixed Periods.

If the calculation method is not specified, calculations are made based a 30-day month.

Dependencies

A calculation is only made if a pro rata method is set in the Pro Rata field.

Example

Contract term    02/15/95 - 12/15/95

Condition amount    1000 EUR

Pro Rata Method    Contract Start and End Pro Rata

Calculation Method    30 Days for Every Month

In this case, the system determines an amount of 533.33 EUR (16/30 of 1000) for February; 1000 EUR for March to November; and 500 EUR (15/30 of 1000) for December.

If you use the Exact Days calculation method instead, the amount determined for February is 500 EUR (14/28 of 1000) and 483.87 EUR (15/31 of 1000) for December.

If you change the Pro Rata setting, the amount is 1000 EUR for each non-prorated period, regardless of the calculation method.

History
Last changed by/on SAP  20030326 
SAP Release Created in 46C