SAP ABAP Data Element REAJDTCHANGEABLE (Indicator: Is valid-from date manually changeable?)
Hierarchy
EA-FIN (Software Component) EA-FIN
   RE-FX-AJ (Application Component) Rent Adjustment
     RE_AJ_CA (Package) RE: Cross Application Adjustment (Comprehensive Functions)
Basic Data
Data Element REAJDTCHANGEABLE
Short Description Indicator: Is valid-from date manually changeable?  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RECABOOL    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name VALID_FROM_CHANGEABLE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Mod. Date 
Medium 15 Date Changeable 
Long 20 Date Changeable 
Heading ChDt 
Documentation

Definition

Specifies if the date, starting on which the change is valid, can be changed manually.

Use

  • Indicator is set ('X')

You can change the date manually when post-processing the adjustment. For example, you can specify that the adjustment determined by the system does not take effect until one month later.

  • Indicator is not set (' ')

You are not allowed to change the date later. The adjustment can only be activated or rejected for the planned date.

History
Last changed by/on SAP  20031111 
SAP Release Created in 200