SAP ABAP Data Element QSELEZEIT (Selection Period for Inspection Lot Processing in Days)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ QM-IM-UD (Application Component) Inspection Lot Completion
⤷ QV (Package) QM usage decision
⤷ QM-IM-UD (Application Component) Inspection Lot Completion
⤷ QV (Package) QM usage decision
Basic Data
Data Element | QSELEZEIT |
Short Description | Selection Period for Inspection Lot Processing in Days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QANZAHL2 | |
Data Type | INT2 | 2-byte integer, only for length field before LCHR or LRAW |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sel.period |
Medium | 15 | Selec. period |
Long | 20 | Selection period |
Heading | 5 | SelPd |
Documentation
Use
To calculate the starting date of the selection time period, the value you enter here is subtracted from the current date.
Example
Selection time period: 10 calendar days
Current date: 9/15/93 (September 15, 1993)
The starting date for the selection time period is 9/5/93.
This means that the system, when a date is relevant for the selection of inspection lots, proposes a time period with the 5th of September as the starting date (calculated) and the current date (15th of September) as the end date.
If you do not enter a value in this field, the starting date of the selection time period is the same as the end date, which is the current date.
History
Last changed by/on | SAP | 19960722 |
SAP Release Created in |