SAP ABAP Data Element QRESTIMEQL (Reset Time Period for Quality Level in Days)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ QM-QC-AQC (Application Component) Active Quality Control
⤷ QDSE (Package) QM sample determination
⤷ QM-QC-AQC (Application Component) Active Quality Control
⤷ QDSE (Package) QM sample determination
Basic Data
Data Element | QRESTIMEQL |
Short Description | Reset Time Period for Quality Level in Days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QRESIDENZ | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Reset time |
Medium | 15 | Reset time per. |
Long | 20 | Reset time period |
Heading | 5 | Reset |
Documentation
Definition
Specifies the time period in days, after which the quality level reverts to the initial inspection stage.
Use
If you enter a reset time period in the dynamic modification rule, the system automatically recalculates and updates the reset date in the quality level on each update or correction of the quality level.
Using the transaction "Change quality level" you can overwrite the reset date entered by the system.
When an inspection lot is created, the system checks if the reset date for the quality level has been reached or exceeded at each sample calculation. In such a case, it resets the qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for the current inspection lot.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |