SAP ABAP Data Element QRESDAT (Reset Date of Quality Level)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ QM-QC-AQC (Application Component) Active Quality Control
⤷ QDSE (Package) QM sample determination
⤷ QM-QC-AQC (Application Component) Active Quality Control
⤷ QDSE (Package) QM sample determination
Basic Data
Data Element | QRESDAT |
Short Description | Reset Date of Quality Level |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ResetDate |
Medium | 15 | ResetDate |
Long | 20 | ResetDate |
Heading | 9 | ResetDate |
Documentation
Definition
Specifies the date when the quality level will revert to and use the initial inspection stage of the dynamic modification rule.
Use
For each change to the quality level that is made without the transaction "Change quality level", the system recalculates the reset date for the quality level.
This occurs, for example, in the following cases:
- When the quality level is updated as a result of an inspection lot being created or a usage decision being made
- When the quality level is tightened or reset through the use of the evaluation program for quality levels
- When the quality level is tightened or reset using a quality notification
You can change the calculated reset date at any time using the transaction "Change quality level".
If the reset date for the quality level is reached or has been exceeded at lot creation, the inspection stage reverts to the initial stage specified in the dynamic modification rule.
Dependencies
The system calculates the reset date using the value in the field reset time period in days in the dynamic modification rule.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |