SAP ABAP Data Element QMENGEPPN (Rework Quantity for The Inspection Point)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
Basic Data
Data Element | QMENGEPPN |
Short Description | Rework Quantity for The Inspection Point |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rework qty |
Medium | 15 | Rework quantity |
Long | 20 | Rework quantity |
Heading | 17 | Rework quantity |
Documentation
Definition
Indicates the quantity to be reworked as a result of poor workmanship or insufficient quality.
Procedure
Enter the rework quantity that has accumulated since the last inspection.
Depending on the confirmation indicator, this quantity is confirmed to the PP operation.
Dependencies
If the rework quantity is simultaneously confirmed for PP, it can have the following effects:
- When you include a reference operation set in the current order from the confirmation (by means of trigger points),the rework quantity is adopted as the operation quantity for the rework operations.
- When you create a new order from the confirmation by means of trigger points, the rework quantity is adopted as the order quantity for the rework order.
Supplementary Documentation - QMENGEPPN 0200
Use
Procedure
Examples
Dependencies
Changes to inspection point quantities that are made using the function Change quantities have no effect on the PP confirmation.
If you also want to change the PP confirmations as well carry out the quantity changes in QM, call the function for results recording for the inspection point.
History
Last changed by/on | SAP | 19960327 |
SAP Release Created in |