SAP ABAP Data Element QKZTRM (Partial Confirmation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   QM-IM (Application Component) Quality Inspection
     QLPP (Package) QM inspection points
Basic Data
Data Element QKZTRM
Short Description Partial Confirmation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type QKZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Part. con. 
Medium 15 Partial conf. 
Long 20 Partial confirmation 
Heading PCO 
Documentation

Use

If this indicator is set, this means that a partial confirmation occurs for the PP operations (in the create transaction) or that it has already occured (change and display transactions).

Dependencies

When quantities are confirmed to PP, they are simultaneously valuated in terms of the target costs, if the following prerequisites are fulfilled:

  • Activities are planned in the task list.
  • In PP-Customizing, the indicator for the proposal of activities is set for the current order type in the order confirmation parameters.
  • You have not called up the details for the order confirmation.
    If you have called up the details, the activities recorded in the detailed data are copied.

History
Last changed by/on SAP  19990310 
SAP Release Created in