SAP ABAP Data Element QKZERM (Final Confirmation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
Basic Data
Data Element | QKZERM |
Short Description | Final Confirmation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fin. conf. |
Medium | 15 | Final confirmtn |
Long | 20 | Final confirmation |
Heading | 3 | FCO |
Documentation
Use
If this indicator is set, a final confirmation of the work operations is going to take place in PP (create mode) or, it has already taken place (change and display modi).
Dependencies
When quantities are confirmed to PP, they are valuated in terms of the target costs at the same time, if the following preconditions are fulfilled:
- Activities are preplanned in the task list.
- In PP-Customizing, the indicator for the proposal of activities is marked for the current order type in the order confirmation parameters.
- You have not called up detailed data for the order confirmation.
If you have called up the detailed data, the activities recorded are transferred there.
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |