SAP ABAP Data Element QKZDYNAUT (Immediate Dynamic Modification at Inspection Lot Creation)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ QM-PT-BD-SPL (Application Component) Samples and SPC
⤷ QD (Package) QM dynamic modification
⤷ QM-PT-BD-SPL (Application Component) Samples and SPC
⤷ QD (Package) QM dynamic modification
Basic Data
Data Element | QKZDYNAUT |
Short Description | Immediate Dynamic Modification at Inspection Lot Creation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Immediate |
Medium | 15 | At lot creation |
Long | 20 | At lot creation |
Heading | 3 | LCr |
Documentation
Use
If you set this indicator, the quality level is updated immediately when the inspection lot is created after sample determination.
When updating the quality level, the system assumes that this inspection lot is accepted or that no inspection characteristic is rejected.
Since the system does not maintain a history for the quality level, this operation is irreversible - even if sample calculation or the whole inspection lot is subsequently cancelled. The quality level is only updated again (with a correction of the quality level), if goods acceptance based on the inspection lot quality is later shown to be incorrect after the usage decision for the inspection lot has been made. Only use this option in the following circumstances:
- If inspection lots or inspection characteristics are rarely rejected.
- If inspection lots with the same dynamic modification criteria are often created before the previous inspection lots are completed and you want to decrease the inspection scope for subsequent lots.
- If you are prepared to accept the consequences of a goods acceptance based on the inspection lot quality not being confirmed.
The system updates the quality level again, when the usage decision for the inspection lot is made. However, unsuitable inspection stages are assigned to all inspection lots created in the period between sample calculation and making the usage decision.
History
Last changed by/on | SAP | 19980323 |
SAP Release Created in |