SAP ABAP Data Element PTREQ_PERIOD_START (Definition of Start of Period)
Hierarchy
☛
EA-HRRXX (Software Component) Sub component EA-HRRXX of EA-HR
⤷ PT (Application Component) Personnel Time Management
⤷ PAOC_TIM_REQUEST (Package) Application Database and Application Objects
⤷ PT (Application Component) Personnel Time Management
⤷ PAOC_TIM_REQUEST (Package) Application Database and Application Objects
Basic Data
Data Element | PTREQ_PERIOD_START |
Short Description | Definition of Start of Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PTREQ_PERIOD_START | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start |
Medium | 20 | Start of Period |
Long | 40 | Definition of Start of Period |
Heading | 40 | Definition of Start of Period |
Documentation
Definition
Specifies the way in which a period is calculated.
Use
You can specify the period for which absences are displayed in one of the following ways:
- As of Current Date:
The period you enter applies as of the current system date. - As of Start of Current Calendar Period:
The period you enter is calculated as of the start of the specified unit, for example, as of the start of the current week or month. - As of Start of Current Period
The specified number of periods is calculated as of the start of the specified payroll period.
The time frame starts as of the current date in each case.
History
Last changed by/on | SAP | 20040210 |
SAP Release Created in | 500 |