Hierarchy
⤷ PT-RC (Application Component) Time Data Recording and Administration
⤷ PAOC_TIM_TMW_CALENDAR (Package) TMW: Calendar Views
Basic Data
Data Element | PT_TIME_STEP |
Short Description | Time Interval |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PT_TIME_STEP | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Interval |
Medium | 15 | Time Interval |
Long | 20 | Time Interval |
Heading | 3 | Int |
Documentation
Definition
Interval in minutes
Use
In this field, you define the intervals in minutes into which an individual day is to be divided.
If you specify large intervals, the display of the day does not take much space. Large intervals are suitable for calendars with few appointments or a wide overview.
You require short intervals if many appointments are entered and are to be clearly laid out. This requires more space, however.
Procedure
Examples
If you enter "60", the day is displayed in intervals of one hour. If the calendar is to be displayed or output as of 9 a.m. the intervals start and end on the hour.
If you enter "45", the day is split into intervals of 45 minutes, for example, 8:45, 9:30, 10:15, and so on.
Dependencies
Appointments that do not correspond exactly to an interval are highlighted in the relevant intervals and the exact time is displayed.
History
Last changed by/on | SAP | 20020225 |
SAP Release Created in | 46C |