Basic Data
Data Element | PSORNO |
Short Description | Due date for net payment from original document |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Origin Doc |
Medium | 20 | Original document |
Long | 30 | Date from original document |
Heading | 0 |
Documentation
Definition
Use
The field defines that the reversal documents of the reversal request are due on the due date of the original receivable.
Dependencies
Example
The customer cannot pay a fine of 300 currency units (CU). The fine was due on 1/6. The amount due was deferred and divided into three due dates for 100 CU. The new due dates are the 1/8, 1/10 and 1/12. The customer pays 100 CU on 1/8 and does not pay any more after that. Consequently, the deferral request is reversed.
The due date of the original receivable was 1/6.
The program assigns 1/6 as the due date for the new documents (reversal documents with due date 1/10 or 1/12) during reversal. The document with due date 1/8 that was already cleared is not processed.
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in | 110 |