SAP ABAP Data Element PSORNF (Retroactive Net Due Date Freely Selectable)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷ PSM-FM-PO (Application Component) Funds Management-Specific Postings
⤷ FMFI (Package) IS-PS: FI Basics for Funds Management
⤷ PSM-FM-PO (Application Component) Funds Management-Specific Postings
⤷ FMFI (Package) IS-PS: FI Basics for Funds Management
Basic Data
Data Element | PSORNF |
Short Description | Retroactive Net Due Date Freely Selectable |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | FreeSlct |
Medium | 15 | FreeSlct |
Long | 28 | Net due date freely slctbl. |
Heading | 10 | FreeSlct |
Documentation
Definition
The field defines that the date on which the open items of a deferral request are due, can be freely selected if the deferral request is reversed.
Use
Dependencies
Example
A customer cannot pay a fine over 300 currency units (CU). The fine was due on 1.6. The amount due is deferred and divided up into three due dates à 100 CU. The new due dates are the 1.8., the 1.10 and the 1.12. The customer pays the 100 CU on the 1.8 and then pays nothing else. Then the reversal of the deferral request takes place.
If the 1.6 is entered for net due date, the program assigns the 1.6. as due date for the reversal document for the due dates 1.10. and 1.12. The document already cleared with the due date 1.8. is not processed.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |