SAP ABAP Data Element PSDSP (MRP indicator for alternative material in product selection)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷
VA (Package) Application development R/3 Sales
⤷
⤷
Basic Data
| Data Element | PSDSP |
| Short Description | MRP indicator for alternative material in product selection |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | MRP ind. |
| Medium | 15 | MRP indicator |
| Long | 22 | MRP ind. for alt. matl |
| Heading | 48 | MRP indicator for alt. matl in product selection |
Documentation
Definition
Material requirements planning (MRP) indicator for automatic product selection.
Use
The MRP indicator displays the alternative material for which a subitem can be created in case a requirement can't be met. Material requirements planning uses the subitem to determine the requirement shortage.
Note:
Only one alternative material can be indicated as relevant for materials planning.
History
| Last changed by/on | SAP | 19980331 |
| SAP Release Created in |