SAP ABAP Data Element PSC_RVCA (Recovered Costs (adjusted))
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷
GJPSC (Package) Development Class for Product Sharing Agreement
⤷
⤷
Basic Data
| Data Element | PSC_RVCA |
| Short Description | Recovered Costs (adjusted) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WERTV9 | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 17 | |
| Decimal Places | 2 | |
| Output Length | 23 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Rc. costs |
| Medium | 19 | Rec. csts (adj) |
| Long | 20 | Recovered csts (adj) |
| Heading | 22 | Rc cst (adj) |
Documentation
Definition
The adjusted recovered costs for a product within a production sharing contract (PSC) are derived based on the adjusted recoverable costs and the remaining cost cap.
If the remaining cost cap exceeds the adjusted recoverable costs, the complete costs can be recovered. Otherwise only the portion up to the remaining cost cap can be recovered. The other portion is carried over to the next period.
The calculation is as follows:
Adjusted recovered costs = min { Adjusted recoverable costs, remaining cost cap }
History
| Last changed by/on | SAP | 20020108 |
| SAP Release Created in |