SAP ABAP Data Element PSC_RVC (Recovered Costs)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷ CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷ GJPSC (Package) Development Class for Product Sharing Agreement
⤷ CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷ GJPSC (Package) Development Class for Product Sharing Agreement
Basic Data
Data Element | PSC_RVC |
Short Description | Recovered Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV9 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 17 | |
Decimal Places | 2 | |
Output Length | 23 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rc. costs |
Medium | 15 | Rec. costs |
Long | 20 | Recovered costs |
Heading | 22 | Recovered costs |
Documentation
Definition
The recovered costs for a product within a production sharing contract (PSC) are derived based on the adjusted recovered costs.
The calculation of the portion of costs that can be recovered is based on the adjusted amount (adjusted by a rate specified in the PSC). However, for the calculation of costs that are to be carried over to the next period it is necessary to use the non-adjusted values.
The calculation is as follows:
Recovered costs = Adjusted recovered costs / Rate
History
Last changed by/on | SAP | 20020108 |
SAP Release Created in |