SAP ABAP Data Element PSC_RVC (Recovered Costs)
Hierarchy
EA-FIN (Software Component) EA-FIN
   CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
     GJPSC (Package) Development Class for Product Sharing Agreement
Basic Data
Data Element PSC_RVC
Short Description Recovered Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV9    
Data Type CURR   Currency field, stored as DEC 
Length 17    
Decimal Places 2    
Output Length 23    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Rc. costs 
Medium 15 Rec. costs 
Long 20 Recovered costs 
Heading 22 Recovered costs 
Documentation

Definition

The recovered costs for a product within a production sharing contract (PSC) are derived based on the adjusted recovered costs.

The calculation of the portion of costs that can be recovered is based on the adjusted amount (adjusted by a rate specified in the PSC). However, for the calculation of costs that are to be carried over to the next period it is necessary to use the non-adjusted values.

The calculation is as follows:

Recovered costs = Adjusted recovered costs / Rate

History
Last changed by/on SAP  20020108 
SAP Release Created in