SAP ABAP Data Element PSC_PIE (Profit (including Excess Profit))
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷
GJPSC (Package) Development Class for Product Sharing Agreement

⤷

⤷

Basic Data
Data Element | PSC_PIE |
Short Description | Profit (including Excess Profit) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV9 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 17 | |
Decimal Places | 2 | |
Output Length | 23 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | Tot. pr. |
Medium | 11 | Tot. profit |
Long | 12 | Total profit |
Heading | 22 | TP |
Documentation
Definition
The profit (including excess profit) for a product within a production sharing contract (PSC) is the total profit that is left of the total production reduced by the calculated royalty and the adjusted recovered costs.
The calculation is as follows:
Profit (incl. excess pr.) = Total production - Royalty - Adjusted recovered costs
History
Last changed by/on | SAP | 20020108 |
SAP Release Created in |