SAP ABAP Data Element PSC_PEE (Profit (excluding Excess Profit))
Hierarchy
EA-FIN (Software Component) EA-FIN
   CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
     GJPSC (Package) Development Class for Product Sharing Agreement
Basic Data
Data Element PSC_PEE
Short Description Profit (excluding Excess Profit)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV9    
Data Type CURR   Currency field, stored as DEC 
Length 17    
Decimal Places 2    
Output Length 23    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Pr. w/o ex 
Medium 14 Pr. w/o excess 
Long 17 Profit w/o excess 
Heading 22 Pr. w/o exc. 
Documentation

Definition

The profit (excluding excess profit) for a product within a production sharing contract (PSC) is the total profit that is left of the total production reduced by the calculated royalty and the maximum costs that may be recovered (defined by the cost cap).

The calculation is as follows:

Profit (excl. excess pr.) = Total production - Royalty - Cost cap

History
Last changed by/on SAP  20020108 
SAP Release Created in