SAP ABAP Data Element PS_STARN (Start Schedule Deviation Plan/Target Negative)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-LIS (Application Component) Logistics Information System (LIS)
⤷
MCDX (Package) Logistics Information System / SAP-BW (Release-Dependent)
⤷
⤷
Basic Data
| Data Element | PS_STARN |
| Short Description | Start Schedule Deviation Plan/Target Negative |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DAUER_6_1 | |
| Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
| Length | 7 | |
| Decimal Places | 1 | |
| Output Length | 9 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | P/TStrtSD- |
| Medium | 15 | P/TStrtSchdDev- |
| Long | 20 | P/T Strt Schd.Devtn- |
| Heading | 8 | P/TStrt- |
Documentation
Definition
Time difference between basic start date and actual start date.
Use
In the standard for the Shop Floor Information System, this key figure is calculated as the mean value, when executing production order analysis and material analysis, and is updated to the information structures SO21 and SO23.
History
| Last changed by/on | SAP | 20100310 |
| SAP Release Created in |