SAP ABAP Data Element PS_SHADOW (Display original schedule)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷ CN_PPT_GRAFIK (Package) Project Planning Board
⤷ PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷ CN_PPT_GRAFIK (Package) Project Planning Board
Basic Data
Data Element | PS_SHADOW |
Short Description | Display original schedule |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_SHADOW | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Orig. schd |
Medium | 17 | Orig. schedule |
Long | 20 | Original schedule |
Heading | 2 | OS |
Documentation
Definition
Specifies whether the original schedule is displayed in the graphics are after rescheduling. You can choose between the following options:
- Not displayed
- The original schedule (baseline) is displayed as in the database
- The previous schedule is displayed
History
Last changed by/on | SAP | 19990412 |
SAP Release Created in |