SAP ABAP Data Element PS_MSGTY (Type of checking during top-down time scheduling)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-DAT (Application Component) Dates
     CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element PS_MSGTY
Short Description Type of checking during top-down time scheduling  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PS_MSGTY    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Checking 
Medium 15 Check. WBS act. 
Long 20 Checking WBS activty 
Heading  
Documentation

Definition

With this key you determine how the activity dates will be checked in top-down scheduling of the work breakdown structure.

The system checks whether the activity dates lie within the basic dates of the WBS elements.

Dependencies

When the dates are exceeded, depending on the scheduling key, you can either

  • not save the dates,

    In this case you must adjust the start and finish dates of the activities.

  • or save the dates.

    In this case the start and finish dates of the activities lie outside the basic dates of the WBS element.

History
Last changed by/on SAP  19940827 
SAP Release Created in 470