SAP ABAP Data Element PS_MSGTY (Type of checking during top-down time scheduling)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
⤷ PS-DAT (Application Component) Dates
⤷ CN_PSP_TRM (Package) Project Structure Plan Dates
Basic Data
Data Element | PS_MSGTY |
Short Description | Type of checking during top-down time scheduling |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_MSGTY | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Checking |
Medium | 15 | Check. WBS act. |
Long | 20 | Checking WBS activty |
Heading | 0 |
Documentation
Definition
With this key you determine how the activity dates will be checked in top-down scheduling of the work breakdown structure.
The system checks whether the activity dates lie within the basic dates of the WBS elements.
Dependencies
When the dates are exceeded, depending on the scheduling key, you can either
- not save the dates,
In this case you must adjust the start and finish dates of the activities.
- or save the dates.
In this case the start and finish dates of the activities lie outside the basic dates of the WBS element.
History
Last changed by/on | SAP | 19940827 |
SAP Release Created in | 470 |