SAP ABAP Data Element PS_AKOKR (Controlling area of requesting cost center)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element PS_AKOKR
Short Description Controlling area of requesting cost center  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CACCD    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table TKA01    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID CAC  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 RCA 
Medium 15 CA (requesting) 
Long 20 CA req. cost center 
Heading COAr 
Documentation

Definition

Key of the controlling area to which the requesting cost center belongs.

Supplementary Documentation - PS_AKOKR 0001

Organizationally the WBS element is assigned to the responsible cost center; this can be the requesting cost center.

Example

The cost center "Printing" needs a new machine for folding newspapers. The cost center "Building Supervision" ist responsible for the execution of the measures.

A WBS element is created with "Printing" as the requesting cost center and "Building Supervision" as the responsible cost center.

Use

The requesting cost center is important in Investment Management:

If the WBS is a capital investment measure,

  • the system transfers the requesting cost center into the master record of the corresponding asset under construction.
  • the system uses the company code of the cost center as the requesting company code.

The requesting company code is the company code in which the asset under construction for an investment measure is managed.

You only need to enter a requesting code if the asset under construction belonging to an investment measure (order or WBS element) should be managed in a different company code than the investment measure (cross-company-code settlement of asset under construction). Otherwise the requesting company code is the same as the company code of the investment measure (order or WBS element).