SAP ABAP Data Element PS_AEBLG (Change document creation allowed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-ST-OPR (Application Component) Operative Structures
⤷
CN_PSP_OPR (Package) Operative Work Breakdown Structure
⤷
⤷
Basic Data
| Data Element | PS_AEBLG |
| Short Description | Change document creation allowed |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Chg.docs |
| Medium | 15 | ChangeDocuments |
| Long | 20 | Change documents |
| Heading | 3 | Doc |
Documentation
Definition
Use this indicator to specify that change documents should be created for all basic data in the work breakdown structure.
Dependencies
The system only creates change documents when the business transaction "Create change documents" is allowed in status management and the work breakdown structure has already been released.
Note that response times are extended if you set this indicator.
Note
Changing the indicator in the project profile affects all existing project definitions and WBS elements.
History
| Last changed by/on | SAP | 19950401 |
| SAP Release Created in |