SAP ABAP Data Element PS_1ROOT (Indicator: WBS can only have one WBS element with level 1)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CN_PSP_OPR (Package) Operative Work Breakdown Structure
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CN_PSP_OPR (Package) Operative Work Breakdown Structure
Basic Data
Data Element | PS_1ROOT |
Short Description | Indicator: WBS can only have one WBS element with level 1 |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | One root |
Medium | 15 | Only one root |
Long | 20 | Only one root |
Heading | 2 | 1R |
Documentation
Definition
Use this indicator to specify that there can only be one WBS element at the first level (root) for each project definition.
Note
If you set this indicator and at this point have projects which already have several WBS elements at the first level, you can still save with several roots. As soon as you save the WBS with only one root, you can no longer create any more WBS elements at the first level.
History
Last changed by/on | SAP | 19960115 |
SAP Release Created in |