SAP ABAP Data Element PROJCHGKZ (Indicator: Status change documents)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CN_PSP_OPR (Package) Operative Work Breakdown Structure
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CN_PSP_OPR (Package) Operative Work Breakdown Structure
Basic Data
Data Element | PROJCHGKZ |
Short Description | Indicator: Status change documents |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Chg.docs |
Medium | 15 | ChangeDocuments |
Long | 20 | Change documents |
Heading | 3 | CgD |
Documentation
Definition
You use this indicator to determine whether change documents are created for the status of a project definition and WBS elements.
Use
Only if change documents are created for status from the start can you recreate a seamless picture of the progress or development of a project or WBS element over time.
Dependencies
If this indicator is set in the project profile, the system sets the indicator in all WBS elements assigned to a new project from the project definition. Changes to the project profile have no influence on existing projects.
Note that response times when you save are extended if you set this indicator.
History
Last changed by/on | SAP | 19940827 |
SAP Release Created in |