SAP ABAP Data Element PREVDAY (Requirements interval is assigned to previous day)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷
PT-SP (Application Component) Shift Planning
⤷
PP08 (Package) Shift Planning
⤷
⤷
Basic Data
| Data Element | PREVDAY |
| Short Description | Requirements interval is assigned to previous day |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFLAG | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 3 | P |
| Medium | 10 | Prev. day |
| Long | 16 | Previous day |
| Heading | 1 | P |
Documentation
Definition
This indicator shows that the requirements interval is assigned to a requirements record from the previous day.
Note
Requirements records and their assignments are always maintained on the day on which they start. Assignments that last more than one day are displayed on the following day as well in the day view.
History
| Last changed by/on | SAP | 20000104 |
| SAP Release Created in |