SAP ABAP Data Element PREVDAY (Requirements interval is assigned to previous day)
Hierarchy
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
   PT-SP (Application Component) Shift Planning
     PP08 (Package) Shift Planning
Basic Data
Data Element PREVDAY
Short Description Requirements interval is assigned to previous day  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short
Medium 10 Prev. day 
Long 16 Previous day 
Heading
Documentation

Definition

This indicator shows that the requirements interval is assigned to a requirements record from the previous day.

Note

Requirements records and their assignments are always maintained on the day on which they start. Assignments that last more than one day are displayed on the following day as well in the day view.

History
Last changed by/on SAP  20000104 
SAP Release Created in