Hierarchy
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ BBP_APPLICATION (Package) Structure Package EBP
⤷ ME (Package) Application development R/3 Purchasing
Basic Data
Data Element | PREIH |
Short Description | Priority for Determination of Sequence |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Priority |
Medium | 15 | Priority |
Long | 20 | Priority |
Heading | 2 | Pr |
Documentation
Definition
The priority determines the sequence in which the individual sources of supply are used. Items with priority are always taken into consideration first, before the items for which no priority has been entered.
Use
- Example without splitting quota:
If, for example, you enter priority one along with a maximum release quantity, then this source of supply is always selected until its maximum release quantity has been exhausted. Only then is the next source of supply selected.
If no maximum release quantity was entered for the item with priority one, this item would always receive the complete requirement quantity.
- Example with splitting quota:
In this procedure, the items are selected in the order of the quota. This sequence can be overridden using priorities.
Please note that the splitting quantity is always based on the quota.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |