SAP ABAP Data Element PRDPL (Production dates or basic dates ?)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | PRDPL |
Short Description | Production dates or basic dates ? |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRDPL | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prod.dates |
Medium | 15 | Prod/BasicDates |
Long | 20 | Prod./basic dates |
Heading | 5 | P/BDt |
Documentation
Definition
Specifies whether planned orders and run schedule quantities are displayed according to the order finish dates or the production finish dates in the individual periods of the planning table.
- If you select the production dates, the last day of the period in which you enter a quantity is interpreted as the production finish date and the other dates are calculated accordingly.
- If you select the basic dates, the last day of the period in which you enter a quantity is interpreted as the order finish date and the other dates are calculated accordingly.
Moreover, if you select the production dates, the periods with the 'daily' split are determined to the minute. This means that the period starts with the beginning of the first shift (for example, 7.00 a.m.) and finishes at the end of the last shift (for example, 7.00 a.m. the next day).