Hierarchy
⤷ CA-GTF-PWB (Application Component) Print Workbench
⤷ EEPA (Package) Print Action Records
Basic Data
Data Element | PR_TO |
Short Description | To-date for processing |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | To Date |
Medium | 15 | To Date |
Long | 20 | To Date |
Heading | 0 |
Documentation
Definition
This is the date until which the print action record is to be processed.
Supplementary Documentation - PROTO_D 0000
Use
If you enter "X", no information is written in file VEIAVi. The test run log is issued.
Procedure
Examples
Dependencies
Supplementary Documentation - PROTO_P 0001
Use
This field has the following significance if you perform maintenance plan costing online:
- If you select the field, the system generates an error log and displays it immediately after costing.
- If you do not select the field, the system does not generate an error log.
If you perform maintenance plan costing in the background, the field has no importance as the system always generates a log. You can display the log using the pushbutton last error log.
Procedure
Examples
Dependencies
Supplementary Documentation - PROTO_P 0002
Use
The field has the following significance if you perform maintenance plan costing for a piece of equipment online:
- If you select the field, the system generates an error log and displays it immediately after costing.
- If you do not select the field, the system does not generate an error log.
If you perform maintenance plan costing for a piece of equipment in the background, the field has no significance as the system always generates a log. You can display the log using the pushbutton last error log.
Procedure
Examples
Dependencies
Supplementary Documentation - PROTO_P 0003
Use
You can create a log in which all costing-relevant inconsistencies are listed.
The system checks all costing-relevant master data for completeness and consistency for this purpose (for example, if all activity types and valuation segments of the assigned materials are maintained). The system issues the corresponding messages in the log in the case of errors or discrepancies.
- If you select the field, the system will generate an error log and display it directly after costing.
- If you do not select the field, the system does not generate an error log.
Dependencies
Example
History