SAP ABAP Data Element PR_SALES (Priority sales order stock)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-MAT (Application Component) Material
     CN_MAT (Package) Material for the project
Basic Data
Data Element PR_SALES
Short Description Priority sales order stock  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC1    
Data Type NUMC   Character string with only digits 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Sales ord. 
Medium 15 Sales or. stock 
Long 20 Sales order stock 
Heading SlO 
Documentation

Definition

You can use the priority to control how stock for a material component is found. A high priority, for example 1, specifies that the system manages the material component with high priority in the sales order stock. If this is not possible (see below), the system searches the stock with the next highest priority.

Dependencies

The setting in the material master and account assignment in the sales order determine whether a material component is managed in sales order stock.

  • You should not select Collective requirements only for the Individ./collective indicator on the MRP 4 detail screen in the material master.

    Change material master

  • The sales order must have an account assignment object.

History
Last changed by/on SAP  19970131 
SAP Release Created in