SAP ABAP Data Element PR_SALES (Priority sales order stock)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-MAT (Application Component) Material
⤷
CN_MAT (Package) Material for the project

⤷

⤷

Basic Data
Data Element | PR_SALES |
Short Description | Priority sales order stock |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC1 | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sales ord. |
Medium | 15 | Sales or. stock |
Long | 20 | Sales order stock |
Heading | 3 | SlO |
Documentation
Definition
You can use the priority to control how stock for a material component is found. A high priority, for example 1, specifies that the system manages the material component with high priority in the sales order stock. If this is not possible (see below), the system searches the stock with the next highest priority.
Dependencies
The setting in the material master and account assignment in the sales order determine whether a material component is managed in sales order stock.
- You should not select Collective requirements only for the Individ./collective indicator on the MRP 4 detail screen in the material master.
Change material master
- The sales order must have an account assignment object.
History
Last changed by/on | SAP | 19970131 |
SAP Release Created in |