SAP ABAP Data Element PR_PROJ (Priority project stock)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-MAT (Application Component) Material
⤷
CN_MAT (Package) Material for the project

⤷

⤷

Basic Data
Data Element | PR_PROJ |
Short Description | Priority project stock |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC1 | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Project |
Medium | 15 | Project stock |
Long | 20 | Project stock |
Heading | 3 | Prj |
Documentation
Definition
You use priorities to control how material component stocks are found. A high priority, such as 1, determines, for example, that the system should manage the material component in project stock. If this is not possible (see below), the system searches for the stock with the next highest priority.
Dependencies
Whether a material component can be managed in project stock depends on the settings in the material master and in the project definition:
- In the material master on the MRP 2 detail screen, the setting Collective requirements only can not be selected.
Change material master
- In the project definition on the Profile Data detail screen, the Project stock indicator must be set.
Change project definition
History
Last changed by/on | SAP | 19970131 |