SAP ABAP Data Element PR_PLANT (Priority plant stock)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-MAT (Application Component) Material
⤷
CN_MAT (Package) Material for the project

⤷

⤷

Basic Data
Data Element | PR_PLANT |
Short Description | Priority plant stock |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC1 | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plant |
Medium | 15 | Plant stock |
Long | 20 | Plant stock |
Heading | 3 | Plt |
Documentation
Definition
You can use the priority to control how stock for a material component is found. A high priority, for example 1, specifies that the system manages the material component with high priority in the plant stock.
Dependencies
The settings in the material master and the project definition determine whether or not a material component can be managed in the plant stock.
- The material may not permit individual requirements. You should not select Individual requirements only for the Individ./collective indicator on the MRP 4 detail screen in the material master.
Change Material Master
History
Last changed by/on | SAP | 19970131 |
SAP Release Created in |