SAP ABAP Data Element PR1VK (Indicator: Link with additional check)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Basic Data
Data Element PR1VK
Short Description Indicator: Link with additional check  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Link 
Medium 15 Link 
Long 20 Link 
Heading Link 
Documentation

Definition

Links two checks with a consecutive check sequence together, so that both conditions must be satisfied before an outline agreement or an outline agreement item may be archived.

Note:

If you do not set the AND link indicator, there will be an OR link between two consecutive checks.

Use

Example

The following examples illustrate the conditions under which archiving takes place:

Example of additional checks 1

Target quantity reached        Target value reached

Check sequence 1        Check sequence 2

[X] AND link        [X] AND link

Validity period expired        Not used

Check sequence 3        Check sequence 4

[ ] AND link        [ ] AND link

In this case, archiving takes place if the target quantity and target value have been reached and the validity period of the outline agreement has expired, or if the outline agreement has never been used.

Example of additional checks 2

Target quantity reached        Target value reached

Check sequence 1        Check sequence 2

[ ] AND link        [X] AND link

Validity period expired        Not used

Check sequence 3        Check sequence 4

[ ] AND link        [ ] AND link

In this case, archiving takes place if the target quantity or the target value has been reached and the validity period of the outline agreement has expired, or if the outline agreement has never been used.

History
Last changed by/on SAP  19980218 
SAP Release Created in