SAP ABAP Data Element PPH_MRP_STOCK_TRANSFER (Include Stock Transfer Materials in Planning)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
Basic Data
Data Element | PPH_MRP_STOCK_TRANSFER |
Short Description | Include Stock Transfer Materials in Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Stk Transf |
Medium | 15 | StkTransf Matls |
Long | 30 | Stock Transfer Materials |
Heading | 30 | Stock Transfer Materials |
Documentation
Definition
Controls whether you want to plan materials in the supplying plants during the planning run for stock transfer.
Use
Select this indicator if you want the system to plan the selected materials in the selected plants and additionally in their supplying plants.
Note that the system also plans stock transfer materials in supplying plants that are not specified in the Planning Scope section.
Dependencies
Example
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in | 616 |