SAP ABAP Data Element PPH_MRP_REGENERATIVE (MRP Regenerative Planning)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
Basic Data
Data Element | PPH_MRP_REGENERATIVE |
Short Description | MRP Regenerative Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Regenertve |
Medium | 15 | RegeneratvePlng |
Long | 20 | Regenerative Plng |
Heading | 15 | RegeneratvePlng |
Documentation
Definition
Controls the planning run type to be used for executing the planning run.
Use
Select this indicator if you want the system to execute a regenerative planning run. In this type of planning run, the system plans all selected materials irrespective of whether they have been changed in any way relevant to MRP since the last planning run.
If you do not select this indicator, the system automatically executes net change planning.
Dependencies
Example
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in | 616 |